Bunker Liners
DURAbunker Ltd offer the following bunker liners:
Better Billy Bunker: Bonded Gravel Liner
DURAcrumb: Wetpour / Rubber Crumb Liner
DURAliner: Woven Fabric Liner
DURAsynth: Synthetic Bunker Liner
Better Billy Bunker
Better Billy Bunker Liner is a patented system that combines locally sourced gravel with custom produced, ST410 Polymer, to provide a seamless bunker liner system.
Key Benefits:
- Drains at 2500” per hour
- Only Bunker Liner to perform bridging test with selected sand
- Prevents Washout on sand flashed faces
- Perches water in sand layer
- Prevents sand contamination
- Prevent ingress of weed from base of bunkers
- 10 year guarantee
Durabunker Ltd are certified installers of Better Billy Bunker Liner, thus uniquely positioned to offer this particular bunker liner, as well as several others, in conjunction with our synthetic bunker edges, all under one roof. We offer long term warranties for peace of mind and value that, we believe, is unparalleled in the industry.
Venues to have used Durabunker with BBB include:
- Kiawah Island Resort
- Interlachen Country Club
- Bayland Links GC
- Fieldstone GC
- Littlehampton GC
- Brickyard Crossing GC
- Sittingbourne & Milton Regis GC
- Golf Park Zurichsee
- Golf Club Lavaux
- The Legend at Brandybrook GC
Littlehampton GC, England
We have had several extreme rain events since installing Durabunker & Better Billy Bunker Liner. 2″ in 1 hour on one occasion, the course was flooded as were the bunkers, apart from the bunkers constructed by Durabunker. Not a grain of sand has moved, no washouts, no contamination, no maintenance. The combination of products is simply amazing!!
Michael Mead
Venues to have used Durabunker with Duraliner (Fabric Liner) include:
- Winter Hill GC
- Grand Ducal GC
- Coombe Wood GC
- Maesteg GC
- Dorking GC
- Erlen GC
- Lanhydrock GC
- Lilleybrook GC
- North Manchester GC
- Oakdale GC
- Padeswood & Buckley GC
- The Monmouthsire GC
- Pontnewydd GC
- Southerness GC
Coombe Wood
Since installing Durabunker edges with Duraliner Fabric Liner in 2016, our maintenance headaches have disappeared. We are delighted with the performance of the synthetic edges and the liner installed by Durabunker.
Andy McEvoy, Course Manager